Up the front the Jag lower arm was readied for installation, I trial fitted the lower pivot shaft and found that, as was stated in the GD build notes, my new shaft was slightly over on OD due to the plating. With the shaft clamped in my press it was the work of a few minutes to reduce the OD with a bit of abrasive pad.
The chassis tube and pivot shaft was well greased, the lower wishbone was offered up to the chassis and persuaded to fit with the thrust washers between the chassis and bushes in the lower arm.
With the shaft knocked through (not all the way or you wont get the nut on!) I could fit the washer and nut and tap through to complete. The nut was tightened and the split pin inserted and bent to lock the nut in place. It does not matter with the powerflex bushes where the lower arm is when the nut is tightened but if you are using direct replacement Jag bushes the lower arm must be horizontal to prevent the bushes from tearing.

With a pair of new bolts (not supplied in the GD bolt kit!) and additional washers front and back I bolted up the top pivot shaft, note the main pivot shaft nyloc's are left loose at this stage.


Next I fitted the shock unit, you can leave this out if you are going to set your geometry now but as I have a bit of time before I come to that task I decided to fit the shock such that the front assy. was self supporting.
Simple really, just use two bolts, two nuts and 4 washers.


From the back..

And a closer shot of the front..

The same sequence was repeated on the other side except I tightened the lower ball joint nut before I located the upper joint into the upright. Took a bit of balancing of the hub on my jack, oh and a support strap in case it slipped off the jack, but the job was done.

Next up the steering rack.....
No comments:
Post a Comment