Thursday, 15 February 2007

The Chassis Build Begins.

After a bit of a 4 month break from doing anything in the garage I thought I ought to press on.

First off I removed the radiator bar and tunnel top sheet to give better access to the chassis, also with the radiator bar removed it gave me a bit more room at the front of the garage.

Rust protecting the inside of the chassis.
The next job was to coat the insides of the chassis tubes with waxoil or similar, I chose Dinitrol ML cavity wax in 500ml aerosol cans instead of using a compressed air driven applicator. I ordered two but only actually needed one to complete the task as you dont want to fill the tubes up, just coat them.

The main advantage of this was that the applicator nozzle was exactly the right size to fit in through the chassis mount holes. All the chassis mounts were removed one at a time and the chassis tubes coated in sections.

Brake Pipes.
At this point I made my first of I’m sure many breaks with the normal build procedure. I decided to do my brake and fuel lines next because my running gear was not yet complete.
Adrian Beaumont, AKA Grease Monkey, very kindly drove up to Swindon to lend me his rivnut gun so that I could fit the brake lines in.

I started with the front T splitter and then started the pipe bending exercise with the front drivers side short link. This did not go too well, as I had the GD pipe kit all the pipes were to the right length and pre terminated, this meant I could not make any mistakes! Soon after getting it wrong I started to get the hang of pipe bending and the link was in.


Next I moved on to do the link across to the other front flexi pipe. This went better.


Next came the link from the T union to the mounting block.


And that’s it, the front brake lines are in.

No comments: