Pretty much the final thing to do before the gearbox goes off to be reconditioned was to clean it up.
Having borrowed a pressure washer (thanks Malc) I set to with my trusted Marine Clean in the air powered sprayer.
The before pic...
With a fair bit of work the grime was removed and the box came up well.
I then refitted the shift mechanism as I have decided to leave the painting of the bracket until after the box has been rebuilt.
So that's as far as we go for the moment.
Hope to get the box off to gearboxman (see www.gearboxman.co.uk)within the next month.
Update: of course what I didnt realise is that the gearbox will be totally stripped and cleaned inside and out as part of the rebuild! Ah well al least it gave me something to do!
What I do need to do is confirm that POR15 metalready will not effect the sealant used to stick the cases back together. I need to do this as I want to use POR15 to paint the box when it comes back from being rebuilt. So I need to conduct a trial on the box as its stands and on some automotive sealant to see if it is effected by the sealant.
No comments:
Post a Comment