The new powerflex bushes went in first and all the parts were laid out ready to go. That's new nuts, bolts, washers, camber shimms and ball joints.


The lower wishbones were much easier with just the bushes to press in place.

The stub axles went back in OK and finished off with the water defector.

New wheel studs went into the hubs next, after battling with them in my vice I bit the bullet and purchased a press. Id resisted doing this earlier in the project to save money but wished I had no as the studs went in in moments. The press also came into place when fitting the bearings and I'm sure it will find many other uses.
With the hubs now fitted with new bearings I assembled the new EBC vented, dimpled brake discs to the hubs.


To complete the assembly the new GD steering arms were fitted with the modified brake pipe brackets. Job done!