Done.
Nothing I can really do now until the engine is run up and the gearbox purchased. Funds building very slowly so maybe a few months before anything else gets ordered.
Dyno booked for 26th April.
Done.
Nothing I can really do now until the engine is run up and the gearbox purchased. Funds building very slowly so maybe a few months before anything else gets ordered.
Dyno booked for 26th April.

With the grip removed I completely stripped the unit down and cleaned all parts ready for re-assembly, it came up quite well.
I had thought I would need to replace the pawl release spring (in the handle) as it was very stiff before but luckily after cleaning and lubricating with silicone spray it works well.
The whole thing was reassembled using copper grease, whether this is right or wrong I don't know but I figured it could only help.
That looks a bit better.
I'm not sure what to do about the grip, I like the clean look of the plain chrome however as it was not intended to be seen its got a couple of notches cut in it. My plastic grip is a bit worn so I could just buy a new one or come up with something a bit different, plenty of time to think about that anyway.
Another job finished.
The end result clears the cable and lever well and only time will tell if its routing will cause and problems with bits to be fitted in the future.
What I did notice when doing this is that handbrake levers are lower than those I have seen in other build pictures, this is what caused me the most trouble during this pipe work as I couldn't get a tight enough bend out of the calliper.
Anyway I found that things were not as they seemed, after completing this pipe work I realised that the levers could move up hence increasing the clearance I have achieved in the picture above.
All being well that's that job done.
And 5000rpm
The TKO 500 and 600 with 0.68 & 0.64 5th's respectively gave too short a 1st and a massive theoretical top speed in 5th.
Right side, kinked it whilst bending! Is knackered.
Step 1.
Step 2.
Step 3.
And illuminated.
Half Sweep.
So lets see how long I stick with these!!
2. Use strip tool supplied to strip insulation away.
3. Fold over core and crimp on terminal. (Fold down terminal ears with long nose pliers)
4. Apply silicone lube and slip on boot.
5. Fit to distributor cap.
6. Repeat for all remaining leads.


With the blocks offs moved to the side ports, JIC adapters fitted to the inlet & outlet, sealant on both gasket faces and assembly lube on the arm, I installed the pump to the block with a little persuasion.
Now I can connect the fuel lines without interfering with the oil filter take off or water hose.

With a spring from the brass colour lever you can just see on the left of this picture to the bolt my choke should remain open.
After a bit of cutting about it fits nicely and is finished off with stainless band clamps. I'm still wondering if I can get some red ones, I know Revotech used to sell them but I cant see them on their website so a phone call is needed.
Next up I fitted the distributor in so that I can measure out for the ignition wires. The dizzy will stay loose until the engine has been timed up on Tim Adams dyno.
The wires were they sorted by length and fitted into the cable holders on the engine.
With every new bit added its really starting to look good.
Continuing on the fuel side I also fitted the rigid line to JIC adapter, after cutting down the 3/8"" hard fuel line the adapter would not fit over so very careful adjustment to the pipe OD was carried out using a fine paper.
What Ive just realised is I now need to buy a steel JIC push fit fitting to avoid Galvanic corrosion issues by using aluminium and steel fittings at the same joint.
Fuel system including fittings and pipe also to be used for PCV.
First problem encountered as I purchased the hose finishes for -6 pipe not realising that this -6 pipe has a larger OD, therefore I need the finishers for the -8 pipe! Another order beckons!
So a quick hunt on the Edelbrock site identified a bottom feed adapter plate which is now on its way from the US along with the required fittings.
Thats looking better.
Next add 1 x carb.
But dont foget to seal up a few holes.

Its all got to come off again to check various things but I couldnt resist mocking it up.
The next thing on the list is plumbing after I ordered most of the bits I needed from Think Automotive today (very helpful) and I also need a new ACG fan and belt to complete the front.


This also gives some indication as to why the dipstick tube needed to be modified.

This posting interface is really having trouble!
Thats its for tonight, need bolts for the top ACG bracket support, the tension bar support and the valve covers to move on now.